先験情報を活用したICAによる系統連系太陽光発電の出力推定手法
スポンサーリンク
概要
- 論文の詳細を見る
A large number of Dispersed Generations (DGs) are expected to be installed in distribution systems. Therefore the state estimation is important problem for stable and reliable system operation. However, it is difficult to estimate the total power of DGs connected to a load-side system from a metering spot on the distribution line because at the metering spot only a sum of the active-power from various loads and DGs can be measured. In this paper, we propose an estimation method for unknown DG-outputs connected to a distribution system. This method enables to estimate DG-outputs by analyzing a power flow data measured at one spot using independent component analysis (ICA). The estimation by ICA needs the same number of observations as estimations. However the observation spot is extremely limited in existing distribution system. So we propose an estimation method which enables to estimate DG-outputs and load-changes from only an observation by using known information of load power and a priori knowledge of insolation.
- 2011-05-01
著者
-
石亀 篤司
大阪府立大学大学院
-
元治 崇
関西電力
-
石亀 篤司
大阪府立大学
-
石亀 篤司
大阪府立大学 大学院工学研究科 電気・情報系専攻 電気情報システム工学分野
-
元治 崇
関西電力(株)電力技術研究所
-
元治 崇
関西電力 株式会社
-
山田 貴義
大阪府立大学 大学院工学研究科
-
元治 崇
関西電力 (株) 電力技術研究所
-
山田 貴義
大阪府立大学 大学院工学研究科
-
石亀 篤司
大阪府立大学 大学院工学研究科
関連論文
- 電気工学分野の人材育成
- 距離構造に基づく相互作用を用いた多点探索型 Tabu Search
- 競争環境下での電力系統解析技術
- リアプノフ法に基づいた電力系統のニューロ安定化制御
- 階層構造を考慮したParticle Swarm Optimization
- Multi Objective Particle Swarm Optimization を用いた電圧無効電力制御
- 速度制御を取り入れた Particle Swarm Optimization
- 電圧制御機器の制御遅れを考慮した電圧無効電力制御
- Tabu Search を組み合わせた Particle Swarm Optimization の検討
- 適応化を考慮したクラスタ構造型 Particle Swarm Optimization