大型タンカーの船体建造に就いて
スポンサーリンク
概要
- 論文の詳細を見る
An attempt is made in this paper to explain the construction of 12,000 gross ton welded tanker in which electrio are welding was incorporated to the extent of nearly 90% a feat never attempted in Japan heretofore. The paper deals mainly on the various phases of material preparation and their dimensional accuracy, as well as, on ground prefabrications and subassemblings, erection and welding sequences, and also, on distortions and contractions produced by the welding. In addition, the construction schedule and the labour aspects are also dealt on. The data contained in this paper has been obtained in actually constructing two vessels of this type, and it is stated in detail, how these findings and actual experience is being applied in the construction of three vessels of the same type now on the shipways under construction.
- 社団法人日本船舶海洋工学会の論文
著者
関連論文
- 溶接順序が收縮及び残留応力に及ぼす影響 : 第3報 残留応力及びクイチガイ
- 溶接順序が収縮及び残留応力に及ぼす影響 : 第2報 全長多層法とブロック法との比較
- 溶接順序が収縮及び残留応力に及ぼす影響 : 第1報 ブロック溶接における横収縮について
- 船殻工事における精度管理の一考察
- 進水時に於けるfore poppetにかかる荷重の測定方法について
- 進水時Fore Poppetにかかる圧力測定の一方法について
- 大型タンカーの船体建造に就いて
- 熔接船の腐蝕
- 大型船進水の一方法について : ヘットによる4条進水台
- 外注管理について
- 内業のコンベアーについて
- 造船鉄機工場における流れ作業方式の採用について
- 熔接工場の作業管理について
- ピーニング法による応力緩和に關する実驗(第 2 報)
- 低温應力緩和法に關する研究