船殻工事における精度管理の一考察
スポンサーリンク
概要
- 論文の詳細を見る
The hull construction work is composed of many unit processes including template production, marking, flame cutting, fitting, welding and so on. Inaccuracy of the geometry of member is produced during the each unit work ; errors increase at a later stage of the hull construction because of the accumulation of errors.A statistical analysis was made or errors produced during unit processes at various stages of the hull construction. Measurements were made of errors which occurred during the hull construction of an oil tanker and a bulk carrier.It has been proved that the errors follow the Gauss distrubution. Values of mean deviation, x^^-, and standard deviation, σ, for the each processes were determined. It has been confirmed that the standard deviation of errors observed at a stage of hull construction can be expressed as the summation of the deviation of errors produced during the preceding stage.Using the result of statistical analysis, the following actions have been made ; 1) The tolerance of inaccuracy at each of the unit processes has been established.2) Quality control of each unit process has been established.3) A standard procedure has been established to minimize the correction which may be required at joints between members to be welded at the erection stage.4) An attempts has been studied to improve the structual design to minimize joint accuracy at the erection stage.
- 社団法人日本船舶海洋工学会の論文
著者
-
宮崎 正博
石川島播磨重工 相生第一工場 船殻工作部
-
横田 健
石川島播磨重工 相生第一工場 船殻工作部
-
横田 健
石川島播磨重工業株式会社相生第一工場
-
南崎 邦夫
石川島播磨重工 相生第一工場 船殻工作部
-
堀 尚志
石川島播磨重工 相生第一工場 船殻工作部
-
下村 泰三
石川島播磨重工 相生第一工場 船殻工作部
-
横田 健
石川島播磨重工
-
南崎 邦夫
石川島播磨重工相生第1工場
関連論文
- 船殻工事における精度管理の一考察
- 進水時に於けるfore poppetにかかる荷重の測定方法について
- 進水時Fore Poppetにかかる圧力測定の一方法について
- 大型タンカーの船体建造に就いて
- 熔接船の腐蝕
- 大型船進水の一方法について : ヘットによる4条進水台
- 外注管理について
- 内業のコンベアーについて
- 船殻鋼材の搬入管理
- 造船産業雑感