造船向けCO2溶接用長尺送給装置(DSフィーダ)の開発
スポンサーリンク
概要
- 論文の詳細を見る
Recently, gas shielded metal arc welding (GMAW) process is widespread in shipbuilding, instead of covered electrodes.As this reason, GMAW process is superior to covered electrodes on the welding efficiency, mechanization and rationalization.But, there are many problems to be solved on application of GMAW process in shipbuilding.One of the problems is the guarantee of long-distance wire feedability.This “DS FEEDER” was developed for welding fabrication in shipbuilding and its features are as follows.1) This feeder is composed of DS FEEDER unit (pull feeder), long-distance cable and its control unit.2) Long-distance cable length is max. 20 meters and its cable is composed of wire conduit tube, welding power cable, shielding gas circuit, and control cables as one body.3) Long-distance cable is smaller outer diameter (max. 25.5mm) and has a suitable flexibility.4) DS FEEDER unit (pull feeder) is easy to handle and smaller size.5) The control unit is suitable to push-pull wire feeding system and guarantee the long-distance wire feedability.
- 大同特殊鋼株式会社の論文
著者
関連論文
- 高溶着溶接技術「ホットマグ溶接法」の開発とその適用
- 自動車排気マニホールド溶接用フェライト系ステンレスMIGワイヤの開発と適用
- ステンレス鋼のTIG溶接作業性に及ぼす表面活性元素の影響
- ガスシールドアーク溶接へのガイド
- 造船向けCO2溶接用長尺送給装置(DSフィーダ)の開発
- 新接合法-CHIP接合法-について