Optimization Method using Combinatorial Auction for Production Scheduling with Batch Processing
スポンサーリンク
概要
- 論文の詳細を見る
Centralized control of production systems is difficult because systems have become increasingly expansive and complex. Autonomous distributed scheduling was proposed to address this problem. Combinatorial-auction based scheduling is one potential method of autonomously distributed scheduling. For such scheduling, it is necessary to decide batch formation and scheduling simultaneously to optimize a production system using batch processing. Therefore, as described in this paper, we propose a simultaneous optimization method for batch formation and scheduling with a combinatorial auction mechanism. In addition, using computational experiments, we aim to evaluate the efficiency and validity of the proposed scheduling methodology with batch formation.
著者
-
Kaihara Toshiya
Graduate School Of Engineering Kobe University
-
Fujii Nobutada
Graduate School Of Engineering Kobe University
-
TOIDE Sayaka
Graduate School of Engineering, Kobe University
-
ISHIBASHI Hisatya
Production Engineering Research Laboratory, Hitachi Ltd.
-
NAKANO Takahiro
Production Engineering Research Laboratory, Hitachi Ltd.
関連論文
- Optimization Method using Combinatorial Auction for Production Scheduling with Batch Processing
- Evaluation of Tool Allocation Strategies in Flexible Manufacturing System(Advanced Production Scheduling)
- 6A2 EVALUATION OF TOOL ALLOCATION STRATEGIES IN FLEXIBLE MANUFACTURING SYSTEM(Technical session 6A : Sophisticated scheduling 3)
- A Study on the Tool Sharing Policy in FMS with Tool Center(Advanced Production Scheduling)
- 3-A-1 A STUDY ON INTEGRATED TOOL ALLOCATION AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEM WITH TOOL CENTER
- B35 A Study on Optimization of Interdivisional Scheduling for Dynamically Changing Manufacturing Environment(Advanced machining technology)
- 2A2 SCHEDULING METHOD IN REAL-VIRTUAL FUSION MANUFACTURING SYSTEM WITH SOCIAL CONTRACT BASED APPROACH : APPLICATION OF COMBINATORIAL AUCTION AT OPERATIONAL PHASE(Technical session 2A: OS1: Practical scheduling approach(2))