2A2 SCHEDULING METHOD IN REAL-VIRTUAL FUSION MANUFACTURING SYSTEM WITH SOCIAL CONTRACT BASED APPROACH : APPLICATION OF COMBINATORIAL AUCTION AT OPERATIONAL PHASE(Technical session 2A: OS1: Practical scheduling approach(2))
スポンサーリンク
概要
- 論文の詳細を見る
In this study, a new concept named Real-Virtual Fusion Manufacturing System (RVF-MS) is proposed, which aims to adaptively and effectively deal with both external and internal fluctuations by realizing a fusion between real production shop floor (real system) and manufacturing model (virtual system). In order to realize the proposed methodology, a concept based on multi-agent system is used for constructing dynamic model in virtual system. In this paper, production scheduling mechanism at operational phase in RVF-MS is proposed. A social contract based approach named Combinatorial Auction (CA), which is used at planning phase, is also applied. The effectiveness of the proposed method is verified by computational experiments for flexible flow shop.
- 一般社団法人日本機械学会の論文
- 2011-07-02
著者
-
Fujii Susumu
Graduate School Of Science And Technology Kobe University:the Faculty Of Engineering Kobe University
-
Kaihara Toshiya
Graduate School Of Engineering Kobe University
-
Fujii Nobutada
Graduate School Of Engineering Kobe University
-
UMEDA Toyohiro
Production Systems Research Laboratory Kobe Steel, Ltd.
-
Fujii Susumu
Graduate School of Science and Technology Sophia University
-
Qian Yi
Graduate School of Engineering Kobe University
-
Umeda Toyohiro
Production Systems Research Laboratory Kobe Steel, Ltd
関連論文
- Optimization Method using Combinatorial Auction for Production Scheduling with Batch Processing
- Magnetic Resonance Thermography Using Water Proton Chemical Shift : Preliminary Results on Self-referenced Technique for Motion Compensation(PROCEEDINGS OF THE SCHOOL OF INFORMATION TECHNOLOGY AND ELECTRONICS OF TOKAI UNIVERSITY)
- Evaluation of Tool Allocation Strategies in Flexible Manufacturing System(Advanced Production Scheduling)
- 6A2 EVALUATION OF TOOL ALLOCATION STRATEGIES IN FLEXIBLE MANUFACTURING SYSTEM(Technical session 6A : Sophisticated scheduling 3)
- A Study on the Tool Sharing Policy in FMS with Tool Center(Advanced Production Scheduling)
- 3-A-1 A STUDY ON INTEGRATED TOOL ALLOCATION AND SCHEDULING IN FLEXIBLE MANUFACTURING SYSTEM WITH TOOL CENTER
- B35 A Study on Optimization of Interdivisional Scheduling for Dynamically Changing Manufacturing Environment(Advanced machining technology)
- A Study of the Proper Amount of Work-in-Process Inventory for Multipurpose Intermediate Products
- 2A2 SCHEDULING METHOD IN REAL-VIRTUAL FUSION MANUFACTURING SYSTEM WITH SOCIAL CONTRACT BASED APPROACH : APPLICATION OF COMBINATORIAL AUCTION AT OPERATIONAL PHASE(Technical session 2A: OS1: Practical scheduling approach(2))
- 4B1 A STUDY OF THE PROPER AMOUNT OF WORK-IN-PROCESS INVENTORY FOR MULTIPURPOSE INTERMEDIATE PRODUCTS(Technical session 4B: Practical systems)