Since it is difficult to store and keep electric energy, the supplier of electric power must try to generate just the right amount required by the consumers. A power station cannot change its output easily, because very big equipment must be controlled, for example a boiler, a turbine, a generator etc. Consequently, forecasting electric load becomes important. According to our survey, the forecasting error of existing or developed methods is almost 3% of the load. This error is sometimes bigger than a copacity of a power unit in many power systems. We wanted to improve the precision by developing a new load-forecasting method. This report describes our fundamental investigations concerning our new method. The shapes of the load curve not only for Saturday and Sunday but also for Monday were different from the shapes of other weekdays. The load for Tuesday to Friday deviated about 100 MW from the average taken over other such weekdays with the same temperature and at the same time of day. Considering days with a temperature change from the previous day of a given value, the deviation of the load increment was about 50 MW from the average of such days. This means that the forecast error should be 5 or 10% if the electric load is forecasted only by temperature or temperature increase. We forecast the load using the multiple regression method. We attempted to forecast the load with various combinations of data. These data include past and present temperature and past load values. 0ne example of a combination of data used was load levels of 48 and 24 hours ago and the previous day’s temperature and the forecasted temperature for the following day. The load forecast errors of the result were about 1%. Because we forecasted the load only for the previously described weekdays (Tuesday to Friday) in only June and July of 1986, this error cannot be claimed to be small but we plan to apply artificial intelligence techniques to improve this proposed method.
- 北見工業大学の論文
著者
関連論文
- 揚水式発電所を含む電力系統の最適運用計画 (第4報)* -環境規制を考慮する場合-
- 周期係数モデルによる翌日総需要予測
- 重回帰モデルを用いた負荷予測 (第1報)* -一般負荷の変化と予測に関する基礎的考察-
- Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 14)* -System Reliability and Economy-
- Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-
- エネルギ-貯蔵装置を含む電力系統の環境規制を考慮した最適運用法
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第5報)* -近似解法、厳密解法及びDP法の比較-
- 一次エネルギ-の供給制約および環境規制を考慮した火力系統の最適運用方式
- 揚水式発電所を含む電力系統の最適運用計画-5-火力並列発電機群の決定法
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第4報)* -最小停止時間の制約を考慮する場合-
- 揚水式発電所を含む電力系統の最適運用計画 (第3報) -A.E.P. 30ノードテスト系統への適用-
- 揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第3報)* −多地域制約の場合-
- NO2累積排出量規制に対する火力発電機の起動停止問題の一解法
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第2報)* -ダイナミック・プログラミング法との比較-
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第1報)*
- 揚水式発電所を含む電力系統の最適運用計画 (第1報)*
- NO_Xの累積排出量が制約された場合の火力発電機群起動停止問題 (第5報)* -揚水式発電所を系統に含む場合−
- NO_Xの累積排出量が制約された場合の火力発電機群起動停止問題 (第4報)*
- NO_Xの累積排出量が制約された場合の火力発電機群起動停止問題 (第3報)*