揚水式発電所を含む電力系統の最適運用計画 (第1報)*
スポンサーリンク
概要
- 論文の詳細を見る
In this paper, we consider the operation of pumping-up power stations such that load factor becomes higher, thermal power stations are operated as economically as possible, and the fuel of thermal power stations is saved. In the first place, we investigate the optimum operation of the power system including a pumping-up power station. In so doing, we consider what is optimum start-up and shut-down for thermal power stations and a pumping-up power station, and how is optimum dispatch to thermal power stations and a pumping-up power station. In the second place, we investigate optimum operation of the power system including some pumping-up power stations. In this time, we consider how is optimum dispatch to pumping-up power stations. Finally, we show the appropriateness of our method by applying it to a model system
- 北見工業大学の論文
著者
関連論文
- 揚水式発電所を含む電力系統の最適運用計画 (第4報)* -環境規制を考慮する場合-
- 周期係数モデルによる翌日総需要予測
- 重回帰モデルを用いた負荷予測 (第1報)* -一般負荷の変化と予測に関する基礎的考察-
- Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 14)* -System Reliability and Economy-
- Probabilistic Operation of Electric Power Systems Considering Environmental Constraint (Part 13)* -A Practical Satisfaction of the Constraint-
- エネルギ-貯蔵装置を含む電力系統の環境規制を考慮した最適運用法
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第5報)* -近似解法、厳密解法及びDP法の比較-
- 一次エネルギ-の供給制約および環境規制を考慮した火力系統の最適運用方式
- 揚水式発電所を含む電力系統の最適運用計画-5-火力並列発電機群の決定法
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第4報)* -最小停止時間の制約を考慮する場合-
- 揚水式発電所を含む電力系統の最適運用計画 (第3報) -A.E.P. 30ノードテスト系統への適用-
- 揚水式発電所を含む電力系統の最適運用計画 (第2報)* -送電損失を考慮する場合-
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第3報)* −多地域制約の場合-
- NO2累積排出量規制に対する火力発電機の起動停止問題の一解法
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第2報)* -ダイナミック・プログラミング法との比較-
- 一次エネルギーの供給制約及び環境規制を考慮した電力系統の最適運用計画 (第1報)*
- 揚水式発電所を含む電力系統の最適運用計画 (第1報)*
- NO_Xの累積排出量が制約された場合の火力発電機群起動停止問題 (第5報)* -揚水式発電所を系統に含む場合−
- NO_Xの累積排出量が制約された場合の火力発電機群起動停止問題 (第4報)*
- NO_Xの累積排出量が制約された場合の火力発電機群起動停止問題 (第3報)*