5C2 STUDY FOR SYSTEM ARCHITECTURE IN PROJECT BASED PRODUCTION
スポンサーリンク
概要
- 論文の詳細を見る
In a project based production such as a construction production, different types of companies/enterprises execute the project cooperating and interdepending with each other. However, there is not any mean to integrate different management systems, and the conventional schedule has to include excessive slack/float because it takes much time to negotiate with other systems according to disturbances occurring frequently during the project. We propose a total management system architecture utilizing parts and packets unification for a project based production. It consists of multiple agents and the bulletin board module connecting them.
- 一般社団法人日本機械学会の論文
- 2009-07-04
著者
-
ARAI Eiji
Department of Manufacturing Science, Graduate School of Engineering, Osaka University
-
Arai Eiji
Department Of Materials And Manufacturing Science Graduate School Of Engineering Osaka University
-
Arai Eiji
Department Of Manufacturing Science Osaka University
-
WAKAMATSU Hidefumi
Department of Manufacturing Science, Osaka University
-
Wakamatsu Hidefumi
Department Of Materials And Manufacturing Science Graduate School Of Engineering Osaka University
-
Wakamatsu Hidefumi
Department Of Manufacturing Science Graduate School Of Engineering Osaka University
-
Koike Minoru
Department of Systems Design College of Industrial Technology
-
Morinaga Eiji
Department of Materials and Manufacturing Science, Graduate School of Engineering Osaka University
-
Morinaga Eiji
Department Of Materials And Manufacturing Science Graduate School Of Engineering Osaka University
関連論文
- Trial-Less Machining Using Virtual Machining Simulator for Ball End Mill Operation(Advanced Manufacturing Technology [I])
- Automatic Production Planning System to Achieve Flexible Direct Machining(Advanced Manufacturing Technology)
- Modeling of shape bifurcation phenomena in manipulations of deformable string objects
- B36 Proposal of System Architecture for Project Based Production(Advanced machining technology)
- 5C2 STUDY FOR SYSTEM ARCHITECTURE IN PROJECT BASED PRODUCTION
- Machined Feature Recognition Based on Feature Loop and Convex Polyhedron
- Qualitative Solid Modelling : Qualitative Solid Operations and a Modelling System
- Determination of Operation Sequences with Minimum Tool-changes in Mechanical Machining
- Pre-Process Evaluation of End Milling Operation Using Virtual Machining Simulator
- Description Model of Designers' Intention in CAD System and Application for Redesign Process
- Geometric Model Based Displacement Analysis System of Mechanisms
- Disassembly Path Generation to Verify the Assemblability of Mechanical Products
- 5A3 SCHEDULING OF ROBOTICS RESEARCH AND ROBOTICS EDUCATION