Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel(<Special Issue>Advanced Production Scheduling)
スポンサーリンク
概要
- 論文の詳細を見る
Marine research vessels and their systems are major assets in the marine resources development. Since the running costs for the ship are very high, it is necessary to reduce the total cost by an efficient scheduling for operation and maintenance. To reduce project period and make it efficient, we applied TOC project management method that is a project management approach developed by Dr. Eli Goldratt. It challenges traditional approaches to project management. It will become the most important improvement in the project management since the development of PERT and critical path methodologies. As a case study, we presented the marine geology research project for the purpose of operations in addition to repair on the repairing dock projects for maintenance of vessels.
- 一般社団法人日本機械学会の論文
- 2003-03-15
著者
-
Chen Lian-yi
Nagoya Institute Of Technology
-
Fujimoto H
Nagoya Institute Of Technology
-
Fujimoto Hideo
Nagoya Institute Of Technology
-
Manti M.
Baruna Jaya Technical Service Unit Agency For The Assessment And Application Of Technology
関連論文
- 3-B-7 APPLYING THE TOC PROJECT MANAGEMENT TO OPERATION AND MAINTENANCE SCHEDULING OF A RESEARCH VESSEL
- Improvement of the Convergence Rate in the Transformation Method for Constrained Optimal Control Problems and its Application
- Improvement of Convergence Rate of the Transformation Method for Constrained Optimization Problems
- Transformation Methods of an Exponential Function Type for the Optimal Control Problems with Constraints : 1st Report, A Method with One Correcting Parameter
- A Penalty Shifting Method for Constrained Optimal Control Problems
- Foreword(Advanced Production Scheduling)
- An Improvement of an Interactive Multiobjective Optimization Methnd and Its Application to the Optimal Design
- Foreword(Advanced Production Scheduling)
- 2-A-2 THE TIME BREAKTHROUGH STRATEGY FOR SCM
- Considerations of a Penalty Shifting Method for Nonlinear Programming Problems
- Applying the TOC Project Management to Operation and Maintenance Scheduling of a Research Vessel(Advanced Production Scheduling)
- Analysis and Experiment of Helical Spring-Type Pressure and Shear Sensor
- Cognitive Control Based Realisation of Human Skill Algorithms
- New Multi-d.o.f. Haptic Device Using a Parallel Mechanism with a Wide Rotational Working Area