ファジィ先行関係とファジィ処理時間を考慮した1機械スケジューリング問題(不確実性とファジィ)
スポンサーリンク
概要
- 論文の詳細を見る
We consider the sigle machine scheduling problem with fuzzy precedence relation and fuzzy processing time. Fuzzy precedence relations relax the ordinary precedence constraints, assuming that each relation reflects the satisfaction level with respect to precedence between two jobs. Further processing times are assumed to be controllable, i.e., we can compress the ordinary processing time of each job and this is expressed by the satisfaction level with respect to its processing time. In this paper, three objectives are considered, i.e., maximal lateness to be minimized, minimal satisfaction level with respect to precedence relation and minimal satisfaction with respect to processing time.
- 社団法人日本オペレーションズ・リサーチ学会の論文
- 1994-10-11
著者
関連論文
- An inconsistency problem in data discretion using equal width interval approach (21世紀の数理計画--アルゴリズムとモデリング--RIMS研究集会報告集)
- 2-G-8 カーネル型SIRMsファジィ推論法による判別分析への応用(意思決定(2))
- SIRMs結合型ファジィ推論法による排他的論理和の実現(脳活動の計測と解析,一般)
- カーネルを用いたSIRMs結合型ファジィ推論法に関する一考察(システムオンシリコン,RFID技術及び一般)
- 可能性・必然性測度を用いた多目的ランダムファジィ線形計画問題に対する効率的厳密解法の構築
- Combined Model for Clustering Observations of Systems Subject to Inefficiency(DEA(2))
- 2105 設備切り替えのあるシート生産工程におけるハイブリッド多目的スケジューリング法
- 確率的最適化における情報について(数理計画)
- 確率計画における逐次サンプリングについて(数理計画)
- 機会制約条件問題に対する推定と一致性について(数理計画)