中型貨物船のマスターバット接手建造法における拘束度および残留応力について
スポンサーリンク
概要
- 論文の詳細を見る
The Master Butt welding method was adopted on the construction of Hull No. 24,M. S, "TOSEI-MARU", 5,000 D. W. T. cargo-boat, for the purpose of shortening the time on the slipway and speeding up the building period.That's to say, two separated hulls (fore and aft. bodies) were built on different slipways, launched individually and then joined each other by the Master Butt Welding method in dry dock.In this report, it is mainly aimed to judge the suitability of this method, by measuring the movement and the stress of the hull occured and the residual stress on the beads of Master Butt Welding which arises in the process of the work. It is also intended herein to estimate the amount of the restriction which the hull will receive from the keel block during joining work of two bodies.According to the result of analizing these measurements we may consider that even the greatest blocks such as those of some hundreds tons could be welded and combined together under less restriction, as far as they are treated satisfactorily with perfect welding procedure. In other worlds, two blocks can be drawn each other by rather small force according to the shrinkage of deposit metal.
- 社団法人日本船舶海洋工学会の論文
著者
関連論文
- 多点同時溶接法に関する研究(第2報) : 多点同時溶接法の理論に対する実験的検証
- 立体ブロツク溶接継手の収縮,剛体移動量,残留応力およびその相互間の関係について
- 多点同時溶接法に関する研究(第1報)
- ライトコルゲートパネルを使用した上部甲板室について
- 中型貨物船のマスターバット接手建造法における拘束度および残留応力について
- 多点同時溶接法に関する研究(第1報)
- 中型貨物船のマスターバット接手建造法における拘束度および残留応力について
- 拘束材の拘束常数の特性に関する研究
- 超大型油槽船の船橋端における応力集中について
- 多点同時溶接法に関する研究-1-
- 中型貨物船のマスターバット接手建造法における拘束度および残留応力について
- Combination Carrierについて