船殼大組立ステージの負荷計画電算化の一例
スポンサーリンク
概要
- 論文の詳細を見る
Recently, shipyards in Japan are devided in two types, new gigantic and old. In new shipyards, they construct oil tankers of rather same type with new effective equipments under simple production system, and in old shipyards, they construct many kinds of ships with old equipments and man-power under a complex construction system. In this report, the authors introduced an example of a new system for loading planning of block assembly by computer in old shipyards. First, many problems existed and examples of improvements in assembly yards were introduced. Next, the new method for loading planning and input-output informations were described. Last, the procedure for planning of final block assembly schedule after manual smoothing of output data were introduced.
- 社団法人日本船舶海洋工学会の論文
- 1974-12-30
著者
-
山内 俊雄
川崎重工業(株)造船事業部
-
上村 郁夫
川崎重工業株式会社
-
上村 郁夫
川崎重工業株式会社神戸工場
-
山内 俊雄
川崎重工業株式会社神戸工場
-
吉川 邦宏
川崎重工業(株)神戸造船工場
-
谷本 信身
川崎重工業株式会社神戸工場
-
瀬川 雅司
川崎重工業株式会社神戸工場
-
深井 敏之
川崎重工業株式会社神戸工場
-
埴原 克夫
川崎重工業株式会社神戸工場
関連論文
- ユニバーサル多点プレス法による船体外板曲げ作業の自動化に関する研究 : (第2報 : 実用化研究)
- ユニバーサル多点プレス法による船体外板曲げ作業の自動化に関する研究 : 第1報 : 基礎的研究
- リバテイー型貨物船の海難損傷部の修理方式について
- 130型Bulk Carrier用HT36鋼板の溶接性とその施工条件について
- 船殼大組立ステージの負荷計画電算化の一例
- 造船の生産管理におけるコンピュータの適用(第3報)