Elemental iodine removal by air-saturated water spray under hypothetical LOCA condition in BWR.
スポンサーリンク
概要
- 論文の詳細を見る
Containment spray tests for elemental iodine vapor removal were conducted under simulated BWR LOCA condition with large-scale JAERI Model Containment. The tests were carried out to determine the behavior of gas phase iodine removal by spray water containing carbonic acid, the mixing effect in the sump pool, and iodine deposition onto the containment wall.<BR>In the tests, a half-life of the iodine concentration decrease in gas phase was obtained as 6-12 min and an iodine partition coefficient was also obtained as 80160 by the spray washout under pH range of 5.35.9. The effect on the mitigation of pH decrease of spray water caused by the iron corrosion process was discussed from the experiments. Results obtained from the tests were compared with those calculated by a code MIRA-PB.
- 一般社団法人 日本原子力学会の論文
著者
-
HASHIMOTO Kazuichiro
Division of Reactor Safety, Tokai Research Establishment, Japan Atomic Energy Research Institute
-
MOTOKI Yasuo
Division of Reactor Safety, Tokai Research Establishment, Japan Atomic Energy Research Institute
-
KITANI Susumu
Division of Nuclear Fuel Research, Japan Atomic Energy Research Institute
-
NARITOMI Mitsuo
Division of Health Physics and Safety, Japan Atomic Energy Research Institute
-
NISHIO Gunji
Division of Nuclear Fuel Research, Japan Atomic Energy Research Institute
関連論文
- Elemental iodine removal by air-saturated water spray under hypothetical LOCA condition in BWR.
- Iodine removal tests for BWR containment spray by large scale facility.
- Selective Collection of Trace Amounts of Radioiodine in Radioactive Sodium Aerosol Utilizing Arc-Discharge Technique
- Calibration of Cascade Impactor by Two-Stage Method