The "Development of Advanced Gas Turbine" was performed for 6 years from 1989 by Tohoku Electric Power Co., Inc. In this project, the element technologies regarding Advanced Gas Turbine which achieves 1500℃ class firing temperature, and 50% (HHV) or more thermal efficiency as a combined cycle plant, were developed. And the element technologies of Full Coverage Film Cooling system (FCFC), which had been used in jet engines, were developed for the large size turbine 1st stage vanes and blades. The fundamental data, such as the aerodynamic efficiency and the cooling efficiency etc. of the 1st vanes and blades were obtained by accumulated with wind tunnel testing, and the applicability of FCFC cooling system to the actual machine was verified. As a result, the FCFC 1st stage vanes and blades were successfully applied to the up-to-date 1500℃ class large-sized gas turbines.
- 2009-09-20
著者
関連論文
- 1500℃級高効率ガスタービン開発のための高温部品検証試験の実施について
- 1a-ZB-6 Ni基超合金単結晶の中性子回折トポグラフィによる観察(2)
- 次世代高温ガスタービンのキーテクノロジー開発 (動力・エネルギ-技術)
- B-2 1500℃級回収型蒸気冷却静翼の高温翼列試験における冷却特性(伝熱)
- カザフスタンにおけるガスタービン・コジェネレーション設備の建設
- 乱流促進リブの形状が伝熱・流動特性に及ぼす効果
- A-8 鈍頭形状をしたガスタービン静翼背側のフィルム冷却性能(伝熱・冷却)
- 乱流促進リブの形状が伝熱・流動特性に及ぼす効果
- 高効率ガスタ-ビンの開発・研究について--熱効率50%以上のコンバインドサイクルプラント実現を目指して (高効率化複合発電)
- 1,500℃級高効率ガスタービン用第1段動静翼の開発について