Online Scheduling Aiming to Satisfy Due Date for Flexible Flow Shops(<Special Issue>Advanced Production Scheduling)
スポンサーリンク
概要
- 論文の詳細を見る
The simplest method for making a production schedule is dispatch of jobs to idle machine tools. The method has a tendency of making a compact and efficient schedule, however the completion time of a job is not determined till the job is selected as the next job on an idle machine. Then, online scheduling methods have been developed, in which the production schedule is made as a job arrives at a machine. In this paper, an online scheduling method is developed for flexible flow shops under the due-date related criteria. A special feature of the method is to set the target completion time for each job and each stage. By numerical experiments, it is clarified that the method is better than FIFO (First In First Out) rule and especially the performance of the online scheduling is greatly superior to FIFO for the shops with heavy workload.
- 一般社団法人日本機械学会の論文
- 2005-03-15
著者
-
Takaku Koichiro
Tis Inc.
-
Yura Kenji
Department of Systems Engineering University of Electro-Communications
-
YURA Kenji
Department of Precision Mechanics, Faculty of Engineering, Kyoto University
-
Yura Kenji
Department of Systems Engineering, University of Electro-Communications
関連論文
- 5A3 ONLINE SCHEDULING FOR FLEXIBLE FLOW SHOPS WITH DUE DATE CONSTRAINT(Technical session 5A : Sophisticated scheduling 2)
- 4B3 INTERACTIVE MULTI-SHIFT SCHEDULING TO SATISFY WORKER'S PREFERENCE ON SHIFT AND DAYS-OFF(Technical session 4B : Personnel scheduling)
- Interactive Multi-Shift Scheduling to Satisfy Worker's Preferences on Shift and Days-off(Advanced Production Scheduling)
- Online Scheduling Aiming to Satisfy Due Date for Flexible Flow Shops(Advanced Production Scheduling)
- Multi-Job Cyclic Scheduling for an Automated Job-Shop-Type Manufacturing System : Relationship Between Job Output Interval and Buffer Capacity