4B3 INTERACTIVE MULTI-SHIFT SCHEDULING TO SATISFY WORKER'S PREFERENCE ON SHIFT AND DAYS-OFF(Technical session 4B : Personnel scheduling)
スポンサーリンク
概要
- 論文の詳細を見る
Interactive multi-shift scheduling method is proposed. The method checks the feasibility of workers' preferences, makes a fundamental shift schedule, and improves the schedule by shifts exchange between the workers. A necessary condition of a feasible schedule is clarified, and a prescreening procedure on the feasibility is developed. By the method, the workers' preferences on shifts are reflected in the shift schedule as large as possible.
- 一般社団法人日本機械学会の論文
- 2004-05-24
著者
-
Yura Kenji
Department of Systems Engineering University of Electro-Communications
-
Shiotani Gakuhei
Department of Systems Engineering University of Electro-Communications
-
YURA Kenji
Department of Precision Mechanics, Faculty of Engineering, Kyoto University
関連論文
- 5A3 ONLINE SCHEDULING FOR FLEXIBLE FLOW SHOPS WITH DUE DATE CONSTRAINT(Technical session 5A : Sophisticated scheduling 2)
- 4B3 INTERACTIVE MULTI-SHIFT SCHEDULING TO SATISFY WORKER'S PREFERENCE ON SHIFT AND DAYS-OFF(Technical session 4B : Personnel scheduling)
- Interactive Multi-Shift Scheduling to Satisfy Worker's Preferences on Shift and Days-off(Advanced Production Scheduling)
- Online Scheduling Aiming to Satisfy Due Date for Flexible Flow Shops(Advanced Production Scheduling)
- Multi-Job Cyclic Scheduling for an Automated Job-Shop-Type Manufacturing System : Relationship Between Job Output Interval and Buffer Capacity