工事管理支援システムに蓄積される生産実績データの分析方法 : 自動化工法の搬送実績におけるケーススタディ
スポンサーリンク
概要
- 論文の詳細を見る
Application of the computer-assisted construction management system in site, stored many kinds of construction progress data in computer. The stored data is expected to be used in construction planning phase, but the useful analysis for the stored data does not exist. The goal of this study is to establish the useful analysis for the stored data. This paper showed one kinds of analysis for the stored data of material handling in finishing work and equipment installation, in the automated construction system. We proposed the analysis based on the characteristic of the stored data, and the process of analysis from whole to detail. As a result, the methods are confirmed to be effective in feedback of planning of material handling in finishing work and equipment installation.
- 社団法人日本建築学会の論文
- 1999-01-30
著者
関連論文
- MOST法による建築工事の標準時間設定 : 建築生産におけるPTS法の適用に関する研究
- 8077 建築工事における工数算定のシステム化に関する研究 : (その3)プロトタイプシステムの開発
- 8076 建築工事における工数算定のシステム化に関する研究 : (その2)MOST実用化のための検討の拡大
- 11062 アクティビティ・ネットワークのリンク配置による表現方法
- 8139 建築工事における工数算定のシステム化に関する研究 : (その1) MOSTの建築作業への適用性について
- 8131 工事実績情報の収集・分析システムの開発 : その1 作業測定支援システムの開発
- 躯体数量情報の生成と生産計画・生産管理への活用--CAD/DrawingからDataへ (特集 3次元CAD活用ガイド--設計-施工ビジュアル化のための手びき)
- 8116 PCa工法における建方計画の支援手法 : その1 工区分割手法の提案とその適用例
- 1174 3次元モデルを活用した鉄骨工事の施工支援システム(金属材料・工程管理,材料施工)
- 建築工事の工程計画における結合率を導入したネットワーク手法
- 8117 PCa工法における建方計画の支援手法 : その2 建方工程における並行作業のモデル化
- 総合建設業における集中調達の基本方式の類型化
- 8052 作業間の順序関係に結合率を導入したネットワーク手法 : その2 プレキャスト工法における建方工事の作業計画への適用
- 8051 作業間の順序関係に結合率を導入したネットワーク手法 : その1 結合率を導入したネットワークの定式化
- 工事管理支援システムに蓄積される生産実績データの分析方法 : 自動化工法の搬送実績におけるケーススタディ
- 8015 調達情報の共有化により集中調達を支援する鉄骨業者情報提供システム(資機材選択/専門工事業選択)
- 8103 次元CADによる施工シミュレーション : その2 4次元CADの概念データ・モデル
- 8102 4次元CADによる施工シミュレーション : その1 4次元CADにより提供できる機能とその用途