D303 OPERATION AND OPTIMIZATION OF WET LIMESTONE/GYPSUM FGD SYSTEM
スポンサーリンク
概要
- 論文の詳細を見る
The main design parameters and process diagram of the first wet limestone/gypsum FGD plant in Guangdong province are introduced, problems met in the course of operation are analyzed emphatically. Optimization of the FGD systems is researched and carried out gradually, which simplifies FGD plant and lower the cost, meanwhile safety and reliability is also improved.
- 一般社団法人日本機械学会の論文
著者
-
Ma Bin
Guangdong Power Test And Research Institute
-
Yang Hua
Guangdong Power Test And Research Institute
-
Zeng Tinghua
Guangdong Power Test and Research Institute
-
Liao Yongjin
Guangdong Power Test and Research Institute
-
Wang Li
Guangdong Power Test and Research Institute