応力測定による採掘の管理
スポンサーリンク
概要
- 論文の詳細を見る
Much effort has been made for the earth pressure control in metal mines as well as limestone mines where the ores are mined by the room and pillar method. To obtain the fundamental data for the earth pressure control in these mines the measurement of the variation in stress in the rock has the earth pressure control in these mines the measurement of the variation in stress in the rock has been made by the photoelastic stressmeter under the authors' guidance. Recently the absolute stress has come to be measured by the stress-relief technique to supply more sub stantial data. These measurements have made mainly on the rock surface around underground openings, where the cracks initiated by excavation are frequently found. Although the measurement has served not a little for the earth pressure control, it is desired that the measurement of the rock stress will be made possible at the points at considerable distances apart from the wall surface by making use of boreholes. However no method to determine the stress in the rock from the measurements made in the boreholes has yet been established. The authors have therefore investigated this problem. The first part of this paper describes the results obtained. Based on the theory of elasticity, they have deduced formulae to be used in determining the amount of stress in the rock (1) from the changes in diameter, (2) from the strains on the bottoms of boreholes and (3) from the strains on the wall of a borehole. The application of these formulae in terms of the measured values gives the observation equations, and the ir solution yields the estimation required of the stress in the rock in question. The minimum number of boreholes that afford the necessary data for determining the amount of stress in the rock has been discussed by examining the rank of the matrix made up of the coefficients of the observation equations. Subsequently two practical examples of stress measurements are described. In the Nakatatsu mine, the absolute stresses on the walls of a number of drifts around the Stope 4-5 of the Nakayama pit were measured, from which it was discussed where or not the rock around the shaft situated near the stope would fail by extracting the one completely. The original stress state, which seems to depend more on the orogeny rather than the topography, was estimated. Judging from the stress concentration that might appear after a complete mining, it was found that complete extraction of ore would be allowed. In the Hikawa mine, the main haulage drift had been driven though the deep strata in the Tobo district before any other excavation was made. For the purpose of obtaining the data for the design of mining, the stresses on the wall of the drift were measured along the drift. Then the original stress states were determined mathematically, which were taken in to consideration in the design of the mining. On the other hand, this measurement presented the data about the stress state in the rock in a mountain district as well as about the influence of faults on the stress state.
- 社団法人日本材料学会の論文
- 1968-10-15
著者
関連論文
- 剛性試験機の設計・製作とコンクリートの剛性試験結果について
- 鉱柱およびその付近の応力について
- 点載荷圧裂試験によるコンクリートの引張強度の決定
- 岩盤内の地山応力と地学的に推定される地殻応力との関連について(岩石力学小特集)
- 光弾性応力計による応力変化の測定
- 応力測定による採掘の管理
- 地下空洞の回りの岩盤内の応力について