Kikuchi Yuka | East Japan Railway Company
スポンサーリンク
概要
East Japan Railway Company | 論文
- Dynamic Work Planning by Using Simulation-based Optimization in Consideration of Workers’ Skill and Training
- 1C1 DYNAMIC WORK PLANNING BY USING SIMULATION-BASED OPTIMIZATION IN CONSIDERATION OF WORKERS' SKILL AND TRAINING
- Distortion of Compression Wave Propagating through Very Long Tunnel with Slab Tracks
- Evaluation of Bending Strength of Carburized Gears Based on Inferential Identification of Principal Surface Layer Defects
- GSD-15 EVALUATION OF BENDING STRENGTH OF CARBURIZED GEARS BASED ON THE INFERENTIAL IDENTIFICATION OF PRINCIPAL DEFECT IN THE SURFACE LAYER(GEAR STRENGTH AND DURABILITY)