1C1 DYNAMIC WORK PLANNING BY USING SIMULATION-BASED OPTIMIZATION IN CONSIDERATION OF WORKERS' SKILL AND TRAINING
スポンサーリンク
概要
- 論文の詳細を見る
This paper deals with a scheduling method of manual work in consideration of On-the-Job Training (OJT). As of skillful works such as maintenance works of airplanes, workers have to learn many kinds of works with OJT. However, it is difficult to balance between working efficiency and keeping the number of skilled workers by performing OJT. The purpose of this study is to adjust the frequency of OJT automatically and to find effective rules to adjust frequency of OJT in order to realize good balance between efficiency and education. The authors propose a simulation-based scheduling optimization system using genetic algorithm.
- 一般社団法人日本機械学会の論文
- 2009-07-04
著者
-
TATEYAMA Takeshi
Tokyo Metropolitan University
-
TATENO Toshitake
Advanced Institute of Industrial Technology
-
SHIMIZU Keiko
East Japan Railway Company
関連論文
- Dynamic Work Planning by Using Simulation-based Optimization in Consideration of Workers’ Skill and Training
- Self-Organizing Map for Group Technology Oriented Plant Layout Planning(Concurrent System Technology)
- 1C1 DYNAMIC WORK PLANNING BY USING SIMULATION-BASED OPTIMIZATION IN CONSIDERATION OF WORKERS' SKILL AND TRAINING