Nakamura Tetsuro | Faculty of Engineering, Toyohashi University of Technology
スポンサーリンク
概要
Faculty of Engineering, Toyohashi University of Technology | 論文
- A Scheduling Method for Painting Line under Pull Production(Advanced Production Scheduling)
- A Sequencing Problem for Mixed-Model Assembly Line with the Aid of Relief-Man(Advanced Production Scheduling)
- A Practical Method for Multi-Objective Scheduling through Soft Computing Approach(Advanced Production Scheduling)
- Multi-Objective Optimization in Terms of Soft Computing
- A Fair and Wasteless Channel Assignment Protocol for Optical Dual Bus Networks