This paper concerns with a scheduling method for painting (preceding) line with much longer production lead-time than assembly (subsequent) line. In general, production schedule of the painting line is made independently based on the forecasted job requirement at the assembly line. When the job requirement changes at the assembly line by virtue of the change of customer order, therefore, production balance is destroyed between the both lines. To avoid the tardiness caused by such unbalance, we need to have many inventories for the painting line. Such countermeasure is taken place in many companies actually. Thus, to avoid the tardiness while keeping small inventory, we propose a scheduling method that makes a Pseudo-Pull production possible for the painting line. We have evaluated the proposed method through computer simulations.
- 社団法人日本機械学会の論文
- 2003-03-15
著者
-
Yoo J
Toyohashi Univ. Technol. Toyohashi Jpn
-
YOO Jae
Faculty of Engineering, Toyohashi University of Technology
-
SHINBO Kojiro
Faculty of Engineering, Toyohashi University of Technology
-
SHIMIZU Yoshiaki
Faculty of Engineering, Toyohashi University of Technology
-
Yoo Jae
Faculty Of Engineering Toyohashi University Of Technology
-
Shinbo Kojiro
Faculty Of Engineering Toyohashi University Of Technology
-
Shimizu Yoshiaki
Faculty Of Engineering Toyohashi University Of Technology
関連論文
- A Scheduling Method for Painting Line under Pull Production(Advanced Production Scheduling)
- A Practical Method for Multi-Objective Scheduling through Soft Computing Approach(Advanced Production Scheduling)
- A Sequencing Problem for Mixed-Model Assembly Line with the Aid of Relief-Man(Advanced Production Scheduling)
- Multi-Objective Optimization in Terms of Soft Computing