大阪モノレール南伸計画の費用便益分析
スポンサーリンク
概要
- 論文の詳細を見る
In this paper, under the consideration of both local environmental status and transportation network, weimplement Cost Benefit Analysis (CBA) for the southward extension plan of Osaka Monorail Loop-lineby applying a Choice Experiment (CE) method. It is estimated that the benefit cost (B/C) ratio is 1.35 under abasic scenario. In addition, with a consideration of different kinds of uncertainty in the future, a numberof sensitivity analyses are implemented. The results of sensitivity analysis indicate that the possibility ofgenerating net benefit is extremely high for the extension plan studied here.