Operating Experience of Asahi Glass 10, 000kW Gas Turbine
スポンサーリンク
概要
- 論文の詳細を見る
Mitsubishi-Westinghouse 10, 000kW gas turbine installed in Asahi Glass Co. Chiba Works has been approved in June 28th 1963 by Japanese Government, and then continuously supplied electric power and the steam which generated by turbine exhaust gas. Total operating hours have reached approximately 6, 000 hours and total generating outputs are about 54, 000, 000kWh.<BR>The following articles describe the outline of its construction, the major experi-enced troubles and the fuel problem.
- 一般社団法人 日本エネルギー学会の論文
一般社団法人 日本エネルギー学会 | 論文
- Modifying Optical Texture of the Coke from Miike Coal
- Development of Petrochemical Industry with the Background of Iron Manufacturing Industry
- タイトル無し
- Study on Development of Waste Oil Combustion Burner for Energy Saving and Low-Pollution (II): Combustion of Waste Oil and Exhaust Emission Characteristics by Internal Mixing Twin-Fluid Atomizer:Combustion of Waste Oil and Exhaust Emission Characteristics
- Study on Development of Waste Oil Combustion Burner for Energy Saving and Low-Pollution (I): Atomization of High-Viscous Liquid Jet by Internal Mixing Twin-Fluid Atomizer:Atomization of High-Viscous Liquid Jet by Internal Mixing Twin-Fluid Atomizer