Long Term Change in Level-Volume Relation of an Accountability Tank for Plutonium Nitrate Solution.
スポンサーリンク
概要
- 論文の詳細を見る
A slight change in the level-volume relation for an accountability tank for a large amount of plutonium nitrate solution (PuN) was observed at the Plutonium Conversion Development <BR>Facility (PCDF) in the Power Reactor and Nuclear Fuel Development Corp. (PNC), Tokai <BR>Works. From the results of annual tank re-calibrations for the plutonium receiving tank from 1985 to 1992 using the incremental feed of nitric acid as the density standard, it became clear that the relation between the level and the volume changed slightly, and the rate of the change was a linear function of operating time. Also it became clear that the change was linear in relation to the level. In the PCDF, the cumulative change in the volume at the nominal level was evaluated to be 0.1% during 8 years' operation. It was also evaluated that the repeatability of the re-calibration is much better than 0.1%. A reasonable frequency of tank re-calibration is once every 5 years.
- 一般社団法人 日本原子力学会の論文
著者
-
SUZUKI Yukio
Power Reactor and Nuclear Fuel Development Corp.
-
HOSOMA Takashi
Power Reactor and Nuclear Fuel Development Corp.