500kV遮断器の抵抗投入による系統全停復旧時の変圧器飽和抑制
スポンサーリンク
概要
- 論文の詳細を見る
A generating plant can not energize longer transmission lines at once after blackout. The generating plant energize shorter transmission lines firstly, then circuit breaker turns on to connect other transmission lines through the transformer. Transient over voltage oscillation may occur in the transmission lines caused by the resonance of the transmission line. It is reported that the peak voltage exceeds more than 2p.u. when the non-sinusoidal wave voltage caused by saturation in the transformer core excites the resonated transmission line.This paper describes the effect for preventing saturation of transformer by turning on contactors with appropriate resistors before main contactors of the 500kV circuit breaker. The first part presents the mechanism of preventing saturation in the transformer core by pre-resistor insertion of 500kV circuit breaker. The second part presents the expected effect in the actual power system simulated by analytical model using a transients simulation program, EMTP.
著者
-
長嶋 洋
九州電力(株)総合研究所
-
小杉 成史
九州電力(株)総合研究所
-
下條 敏一
九州電力(株)総合研究所
-
古川 伸比古
(株)東芝 電力システム社
-
楠 清志
(株)東芝 電力システム社
-
菅田 隆之
(株)東芝 電力システム社
関連論文
- 瞬低実測値と故障計算値による故障点標定手法の改良 : プロトタイプツールの精度向上策・効率化策の検証
- 500kV遮断器の抵抗投入による系統全停復旧時の変圧器飽和抑制
- 減衰率反転による電力系統の第N波安定度解析手法の検討
- 太陽光発電大量導入時における供給信頼度を考慮した揚水発電所の最適運用計画作成への一考察
- 減衰率反転による第N波安定性を考慮したATC計算手法の高精度化の検討
- 励磁突入電流および残留磁束の解析を目的とした変圧器励磁回路モデルの開発