This paper presents the evaluation of work zone capacity in Thailand and the development of closure scheduling tools in order to schedule work zone by minimizing all related traffic impacts. The results of the capacity analysis revealed that the work zone capacities deriving in this study are higher than the work zone capacities suggested by the highway capacity manual, HCM 1994. These capacities are used to develop the closure scheduling tool. The developed tool is computer-based which considers the excessive flows due to lane closure and determine the dissipation period affecting from the closure. The results show the summary of dissipation durations for different closure schedules. To demonstrate the real world application of this developed tool, a selected section of Highway No.1 (Phaholyothin highway) was selected as a case study. Results revealed that the unsuitable closure periods are 6:00 hr. to 8:00 hr. and 16:00 hr. to 18:00 hr.
- Eastern Asia Society for Transportation Studiesの論文
著者
-
TANABORIBOON Yordphol
School of Civil Engineering Asian Institute of Technology
-
PAISALWATTANA Suebpong
School of Civil Engineering Asian Institute of Technology
関連論文
- AN EVALUATION OF THE EFFECTIVENESS OF PRIVATE VEHICLE INSPECTION PROCESS IN THAILAND
- STUDY OF TRAVEL FACTORS THROUGH STRUCTURAL EQUATION MODELING APPROACH IN BANGKOK
- A PROTOTYPE OF THE GIS-BASED TRAFFIC ACCIDENT DATABASE SYSTEM: THAILAND CASE STUDY:THAILAND CASE STUDY
- AN INTEGRATION OF HAND-HELD COMPUTERS, GPS DEVICES, AND GIS TO IMPROVE THE EFFICIENCY OF EMS DATA SYSTEM
- STUDY ON THE IMPACT OF SHORT-TERM WORK ZONE ALONG AN UN-INTERRUPTED FLOW HIGHWAY: A CASE STUDY IN THAILAND