停電損失を考慮した事故時負荷復旧順序の決定手法* -しゃ断器投入時間を考慮した場合-
スポンサーリンク
概要
- 論文の詳細を見る
In this paper, the authors propose a method for determining the load restoration sequence taking into account the cost of interruptions electrical service, under conditions where the time for operating circuit breakers to restore a load exceeds the time required to increase the generators’ electrical power up to meet the demand. To find the suboptimal solution to this problem, it is formulated as a nonlinear 0-1 programing, and it can be solved by the lexicographical enumeration procedure. An example demonstrates that the proposed method is effective for restoring the load, because the cost of interruptions electrical service using the suboptimal solution of the proposed method is lower than that with the traditional solution which uses load priorities. It seems to he impossible to apply the proposed method to real large power systems through a real-time on-line computer, because the solution by this method takes too much computing time, unless a more effective bounding algorithm can be developed. Nevertheless it is effective to apply the proposed method to the determination of the load restoration sequence for some hypothetical faults in power systems through a off-line computer.
- 北見工業大学の論文
北見工業大学 | 論文
- 有機高分子膜ガス溶解度係数測定のための新規測定法の開発
- 通風乾燥工程中の食品内水分移動機構の解析
- 魚肉ソーセージの水分移動メカニズムの解析
- 魚肉ソ-セ-ジの水分移動メカニズムの解析
- 牛骨由来アパタイト粉末の調製と異種たんぱく質吸着特性によるキャラクタリゼーション