Pb-309 未利用バイオマス燃料を考慮した清掃工場の最適計画(3.導入・システム,ポスターセッション2)
スポンサーリンク
概要
- 論文の詳細を見る
This paper proposes the optimal planning of incineration plants considering the unused biomass fuel. When improve power generation efficiency in areas where quantities of refuse are small, it is essential to utilize resources like woody biomass which generates high amount of heat. Among them, unused wood is attracting attention. Though it has a latent availability as a resource, its collection cost is high, so it had been left in the woods without being carried out, but there is a possibility that implementation of FIT may make it possible to earn electric power selling revenue to complement the collection cost. This study verifies the effect of the introduction of unused biomass fuel. As a result, there is no merit in the present situation, the benefits will come if the available amount increases.
- 2012-12-25
著者
-
加藤 政一
東京電機大学
-
菅原 秀雄
東京電機大学大学院工学研究科
-
鎌田 直樹
東京電機大学大学院先端科学技術研究科
-
菅原 秀雄
東京電機大学
-
菅原 秀雄
東京電機大学大学院先端科学技術研究科
-
鎌田 直樹
東京電機大学
関連論文
- 連接水系を考慮した最適運用計画決定手法
- 需要家の二次電池を用いた系統制御手法とその検証
- 連接水系を考慮した最適運用計画決定への発見的手法の適用
- 増設ごみ発電設備の高圧連系に関する実証的研究 (特集 第30回全国都市清掃研究・事例発表会より)
- 「競争環境下の電力系統計画手法」特集号によせて
- The International Conference on Electrical Engineering 2007 (ICEE2007) 参加報告
- 火力機の負荷・周波数応答シミュレーションモデルと周波数変動に対する応答特性評価
- 電力小売事業者の購入電力最適配分問題と最適調達問題の一解法
- 電力システム運用における最適化技術
- 東京23区部の実績データを用いた売電収入最大化のための清掃工場の最適運用 (特集 第32回全国都市清掃研究・事例発表会より)
- ごみ発電の最適運用に関する検討
- CO_2排出削減を目的とした多年度電源計画手法の研究
- 大規模停電はどうして起こるか?
- 大都市域の清掃工場の最適な全体計画
- 大都市域の清掃工場の最適な全体計画
- Pb-309 未利用バイオマス燃料を考慮した清掃工場の最適計画(3.導入・システム,ポスターセッション2)
- 風力発電偏在化の影響による潮流変動の抑制を目指した周波数制御手法の検討
- 学界情報:ICREPQ'13 報告
- 地域エネルギーシステムにおけるリスクを考慮した最適設備計画
- 風力発電機の系統連系可能量算出方法の検討