E105 石炭ガス化複合発電(IGCC)実証プロジェクトの進捗状況(OS6 高温・高効率発電),動力エネルギーシステム部門20周年,次の20年への新展開)
スポンサーリンク
概要
- 論文の詳細を見る
Integrated coal Gasification Combined Cycle system (IGCC) is higher thermal efficiency, since the system does combined power generation with product gas from gasifier. In Japan, the development of IGCC with the air-blown gasifier is being executed by electric power companies jointly. IGCC Demonstration Project is being promoted so as to demonstrate the reliability, durability and economical competitiveness as final step to commercialize. The project is being conducted by Clean Coal Power R&D Co., Ltd. (CCP). The fund and personnel for CCP are contributed by nine regional electric power companies, J-POWER, and CRIEPI. The EPC contract of the entire plant was ordered to Mitsubishi Heavy Industries, Ltd. (MHI). The durability test for 5000hours has been carrying out since June 2009. A sub-bituminous coal was tested in the plant and the power output using sub-bituminous coal reached 200MW.
- 2010-06-20
著者
関連論文
- S0801-1-2 石炭ガス化複合発電(IGCC)実証プロジェクトの進捗状況(IGCC/CCS)
- クリーンコール技術開発 空気吹きIGCCの開発状況 (特集 火力発電の高効率化とクリーンコール技術)
- E105 石炭ガス化複合発電(IGCC)実証プロジェクトの進捗状況(OS6 高温・高効率発電),動力エネルギーシステム部門20周年,次の20年への新展開)