216 医療機器・介護用ベッドの一貫生産ラインの展開(OS2-4 先進システムの構築)
スポンサーリンク
概要
- 論文の詳細を見る
This paper describes for developing a new continual manufacturing process, we named "Synchronized" & "Harmonized". The Synchronized Line has non WIP from welding to assembling by one set flow. The Harmonized Line has 2 hours WIP from welding to assembling by minimum rot flow, which painted different colors. As a result, we achieved that reduction of manufacturing leadtime form 5 days to 6 hours and we decrease work-in-process by 63% down.
- 2010-03-12