A Proposal for the Scheduling of Cell Manufacturing Through TOC(<Special English Issue>Global Supply Chain Management)
スポンサーリンク
概要
- 論文の詳細を見る
The purpose of the implementation of Theory of Constraints (TOC) concepts in cell manufacturing scheduling is to introduce an alternative that generates a better total makespan of a cell based on a flow-shop production system, while analyzing also the labor productivity of the system. The drum-buffer-rope (DBR) cell algorithm is compared to a schedule based on a random rule to determine its efficiency by evaluating different system sizes. The results show that the DBR-cell algorithm performs better under a system with a small number of resources. This can be considered a consequence of the difficulty to determine a single resource as a constraint in larger systems. Furthermore, productivity also becomes larger in comparison with random scheduling as a system's size increases in terms of jobs.
- 社団法人日本経営工学会の論文
- 2007-02-15
著者
-
Castillo Gabriel
Industrial Engineering And Management Department Tokyo Institute Of Technology
-
Suzuki Sadami
Industrial Engineering and Management Department, Tokyo Institute of Technology
-
Enkawa Takao
Industrial Engineering and Management Department, Tokyo Institute of Technology
-
Enkawa Takao
Tokyo Insitute Of Technol.
-
Suzuki Sadami
Tokyo Inst. Technol. Jpn
関連論文
- A Proposal for the Scheduling of Cell Manufacturing Through TOC(Global Supply Chain Management)
- Introduction of Equalized Lot Size Concept in TOC Scheduling
- OPTIMAL SECOND REPLENISHMENT POLICY IN TWO-PHASED PUSH CONTROL SYSTEM
- Supply Chain Operational Performance and Its Influential Factors : Cross National Analysis(Global Supply Chain Management)