地盤沈下を阻止するための許容限界水頭(揚水量)の求め方 : 地盤沈下観測井を用いて
スポンサーリンク
概要
- 論文の詳細を見る
Fig. 3 shows the relation between groundwater head H and cumulative compaction s which were recorded by the Matsubara observation well set in Hiratsuka City, Kanagawa Prefecture. The relation between H and s can be read as a stress-strain curve (MIYABE, 1972). The following three patterns have been distinguished from H-s curve (Research Group for Water Balance, SHIBASAKI 1975). I: compaction stage with declining groundwater head II: rebounding or stopping compaction stage with rising groundwater head III: compaction stage with stable groundwater head (residual compaction stage) We consider that if residual compaction rate ds/dt (mm/month) is nearly zero at the third patern stage, it is possible to prevent land subsidence at field site. As shown in Fig. 3, each ds/dt corre sponding to mean stable groundwater head Hm can be required. Fig. 4 shows the liner relation of these values of Hm and ds/dt that are plotted on logarithm graph. We can see groundwater head of 35.2 m below the ground surface corresponding to negligible residual compaction rate of 0.1 mm/month. The groundwater head obtained by the mentioned method is persumed as the permissive critical groundwater head for the prevention of land subsidence. Closed relation is also observed between puming yield Q from the whole basin and groundwater head H at the Matsubara station, and the fluctuation of groundwater head is directly affected by pumping yield. We can read off Fig. 7-(b) permissive yield of 100,000 m^3/day corresponding to permissive groundwater head of 35.2 m.
- 地学団体研究会の論文
- 1979-03-25
著者
関連論文
- 静岡県高草山地域の層序と構造
- 地盤沈下を阻止するための許容限界水頭(揚水量)の求め方 : 地盤沈下観測井を用いて
- 観測井記録から読みとれる許容限界水頭 : 平塚市の例 : 応用地質
- 人間による大地の運動--南関東地方にみられる例 (関東平野における第四紀後期の環境変化と文化の発達)