奥会津地熱系の生産管理と資源量評価(<特集>地熱利用技術の研究開発最前線)
スポンサーリンク
概要
- 論文の詳細を見る
Since 1995, Okuaizu Geothermal Co., Ltd. has provided geothermal steam for the Yanaizu-Nishiyama Geothermal Power Station of Tohoku Electric Power Co., Inc. The installed power plant capacity is 65MW and during 13 years, it has produced an average of 45.6MW electricity means of a calendar calculation. The total amount of produced steam and water reaches 51 million tones (457t/h) and 6 million tones (54t/h) respectively. A volumetric estimate of the total amount of heat stored in the reservoir provided an availability of 67MW production during 25 years with 90% possibility by Monte Carlo Method. A reservoir evaluation study of a double porosity model was done after 6 years of production with enthalpy data from 19 production wells. It concluded the necessity of every year make-well for 45MW operation of 20 years more. To assist the sustainability and renewable of the Oku-Aizu Geothermal System, water re-injection into the deepest part of the production area is being continued from 1982. For the management of the production, decline curve analysis method is useful and the trends are distinguished into 5 categories; normal decline, irregular shaped, parabola shaped, increasing and interference trend. In case of the irregular shaped trend and the parabola shaped trend occur, well-bore stimulation method is applied using fresh water and/or hydrochloric acid.
- 一般社団法人日本エネルギー学会の論文
- 2008-10-20
著者
関連論文
- 奥会津地熱地域における貯留層変動探査システム統合化 : その1 統合化のベースとなるデータ及びモデル
- 奥会津地熱地域における貯留層変動探査システム統合化 : その2 TOUGH2からのモデルの移行
- 奥会津地熱フィールドの現況と今後の貯留槽管理技術研究への期待 (特集 貯留層変動探査法の目指したこと)
- 高感度傾斜計による貯留層の動的特性評価(奥会津地区を例として)
- 2050年自然エネルギービジョンにおける地熱エネルギーの貢献
- Case Histories
- 奥会津地熱系の生産管理と資源量評価(地熱利用技術の研究開発最前線)
- 奥会津地熱系の持続的再生性と生産トレンド解析
- 地熱発電の材料に関わる技術的課題の概観
- 福島, 奥会津地熱地帯の探査とその開発
- 特別企画にあたって : 概要
- 日本の地熱発電所の新規建設を進めるには…
- 奥会津地熱フィールドにおける蒸気減衰対策
- 特別寄稿 柳津西山地熱発電所運開から9年の蒸気供給の現況
- 柳津西山地熱フィールド蒸気生産設備の塩酸酸性腐食問題と対策
- 日本のエネルギー革命