諫早湾調整池における降雨時の非点源汚濁負荷流出量の予測と評価に関する研究
スポンサーリンク
概要
- 論文の詳細を見る
At Isahaya of Nagasaki in Japan, a big project for constructing a sea-dyke and reclaimed land has just been finished, and the inner part of Isahaya bay becomes an enclosed water body. Then, in order to avoid eutrophication in the pond, integrated water management over a watershed for the water region called regulation pond should elaborately be pursued. For reducing the pollutant runoff loads from the watershed, washoff rate of each pollutant from non-point sources should be made clear, based on the hydrological condition of watershed. So, considering the geographic condition shown by GIS data, pollutant runoff rates from non-point sources are investigated considering a time series of rainfall, i.e. the antecedent and current ones. For the above-mentioned purpose, field observation of water quality has been progressed, especially under the rainfall condition. In addition, authors already proposed the mathematical mode (Noguchi et al., 2005, 2006), which can evaluate the pollutant runoff rates from diffuse sources if model parameter will appropriately be identified. In this paper, observed data of total nitrogen (T-N) as pollutants are shown. Furthermore, efficiency of the above-mentioned model has been discussed for prediction and evaluation of runoff loads.
著者
-
北島 雄太
長崎大学大学院生産科学研究科
-
松永 学
長崎大学工学部社会開発工学科
-
北島 雄太
長崎大学大学院生産科学研究科博士前期課程環境システム工学専攻
-
田中 晃司
長崎大学工学部社会開発工学科
-
松永 学[他]
長崎大学工学部社会開発工学科
関連論文
- 諫早湾調整池における降雨時の非点源汚濁負荷流出量の予測と評価に関する研究
- 川内川豪雨災害被災地を対象にした避難情報の伝達に関する調査
- 都市域における二河川同時外水氾濫解析(河川・湖沼・地下水の流れ(1),一般講演)