山陰本線(京都〜園部間)複線化工事(<小特集>社会基盤整備)
スポンサーリンク
概要
- 論文の詳細を見る
This paper reports the outline of the doubling track construction of Sanin-Line between Kyoto station and Sonobe station. The purpose of this construction is to improve the transport capacity of the Sanin-Line, especially at the single-track section between Kyoto and Sonobe station (34.2 km). Total length of this construction is 22.8 km and it consists of 3 sections, from Kyoto to Nijyou (3.3 km), from Hanazono to SagaArashiyama (3.4 km) and from Umahori to Sonobe (16.1 km). In order to add a new track along the existing track in these areas, it is necessary to face with several geotechnical problems for the construction of high embankment or cutting slope.
- 社団法人地盤工学会の論文
- 2007-04-01