A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING(<Special Issue>Advanced Planning and Scheduling for Supply Chain Management)
スポンサーリンク
概要
- 論文の詳細を見る
There are a large number of multi-stage job-shop processes in production plants. Steel making process is also modeled as of a multi-stage job-shop process with crane handling. In the steel making process if there are two or more overhead traveling cranes for material handling in a house, it becomes very difficult to obtain in practice an optimal or near optimal solution under consideration of restrictions concerning crane interference caused between them as well as many restrictions for each facility in the house of production plant. In this paper, we first present a formulation of the scheduling problem taking account of the crane interference and then propose a heuristic algorithm to find a sub-optimal solution which starts at feasible solutions and solves the problem in a finite time. The algorithm is characterized by restricting search space and using hybrid method of depth-first search and width-first search on an enumeration tree for crane assignment. We also discuss an availability of this algorithm using a numerical simulation for a practical steel making process.
- 社団法人日本オペレーションズ・リサーチ学会の論文
著者
-
Takahashi Yutaka
Kyoto University
-
Sakai Hideaki
Kyoto Univ. Kyoto Jpn
-
Sakai Hideaki
Kyoto University
-
Tanizaki Takashi
Sumitomo Metals (Kokura), Ltd.
-
Tamura Takayoshi
Nagoya Institute of Technology
-
Imai Taichi
Canon System Solutions Inc.
-
Tanizaki Takashi
Sumitomo Metals (kokura) Ltd.
-
Sakai Hideaki
Kyoto Univ.
関連論文
- PERFORMANCE ANALYSIS OF OPTICAL BURST SWITCHED NETWORKS WITH LIMITED-RANGE WAVELENGTH CONVERSION, RETRANSMISSION AND BURST SEGMENTATION
- ALGORITHMIC COMPUTATION OF THE TRANSIENT QUEUE LENGTH DISTRIBUTION IN THE BMAP/D/c QUEUE
- Per-Tone Equalization for Single Carrier Block Transmission with Insufficient Cyclic Prefix(Digital Signal Processing, Recent Advances in Circuits and Systems-Part 1)
- A Rate Control Scheme for the ATM ABR Service Class
- SB-9-3 Simple Cell Scheduling for Application Level Jitter Reduction over ATM-ABR service
- Proactive Retransmission and Buffer Management for Layered Video Transmission over Wireless Channel
- A HEURISTIC SCHEDULING ALGORITHM FOR STEEL MAKING PROCESS WITH CRANE HANDLING(Advanced Planning and Scheduling for Supply Chain Management)
- 7A2 A Heuristic Scheduling Algorithm for Multi-stage Job-shop Process with Crane Handling(Technical session 7A: Machine and shop scheduling 2)
- A Planning Model for Lot Production on Short Planning Horizon : Series C : Vibration, Control Engineering, Engineering for Industry
- 3B3 Complexity of a dynamic lot-scheduling problem formulated by a 0-1 pure integer programming(Technical session 3B : Combinatorics 2)
- FOREWORD (Special Section on Digital Signal Processing)
- BLOCK-LEVEL SUCCESS AND LOSS RUNS FOR STREAMING SERVICES OVER WIRED-WIRELESS NETWORKS