5A1 SCHEDULING IN TRADITIONAL CONSTRUCTION METHODS(Technical session 5A : Sophisticated scheduling 2)
スポンサーリンク
概要
- 論文の詳細を見る
There are many studies on construction planning of high-rise buildings. But, possibility of various division of building construction areas is not considered well in former studies. So it is difficult to apply their methods in practical projects, many of which have a different plan in every floor. There are few studies on construction planning of work using traditional methods. In this paper, the authors build a model for traditional construction methods. The optimization of the scheduling is obtained considering various divisions of building construction areas.
- 一般社団法人日本機械学会の論文
- 2004-05-24
著者
-
Kaneta Takashi
Dept. Of Architecture And Architectural Engineering Kyoto University
-
Furusaka Shuzo
Dept. of Architecture and Architectural Systems, Kyoto University
-
MUROYA Taizo
Dept. of Architecture and Architectural Engineering, Kyoto University
-
LI Yue
Dept. of Architecture and Architectural Engineering, Kyoto University
-
Muroya Taizo
Dept. Of Architecture And Architectural Engineering Kyoto University
-
Furusaka Shuzo
Dept. Of Architecture And Architectural Engineering Kyoto University
-
Li Yue
Dept. Of Architecture And Architectural Engineering Kyoto University
関連論文
- Development of Risk Analysis Method for Building Projects
- 5A1 SCHEDULING IN TRADITIONAL CONSTRUCTION METHODS(Technical session 5A : Sophisticated scheduling 2)