2A4 A STUDY ON THE PERIOD PLANNING MODEL FOR ITEMS WITH SUCCESSIVE DIFFERENT DEMAND PERIODS(Technical session 2A : Production and Inventory)
スポンサーリンク
概要
- 論文の詳細を見る
This research investigates the production planning problems of products with successive different demand periods and starting points, in particular, multiple phases, single-lot production, and the method for deciding on start-up counts, production lot sizes, length of the production period, and production starting points under the Standard Cyclic Scheduling system. The results of the analysis indicate that the type of mechanism interferes with the planning period, and we looked into ways of resolving this issue.
- 一般社団法人日本機械学会の論文
- 2004-05-24