深層混合処理工法による安定対策を施した軟弱地盤上の盛土の動態観測結果(<小特集>側方変位・流動の予測と対策)
スポンサーリンク
概要
- 論文の詳細を見る
This observation was conducted on the planned highway interchange site. The site was on the typical soft ground over which the soft clay layer and loose sandy layer are distributed by turns in geology. As a soil improvement method, combined use of Plastic board drain method and Deep mixing method (DJM) was adopted. In this case, since a differential settlement with the embankment central part is not avoided when improving only directly under a embankment slope by Deep mixing method, the long-term stress concentration to the improvement area in a slope side may pose a problem. In the text, as a result of the in-situ observation conducted in order to investigate the deformation and stress state of a Deep mixing block, comparison with the result of the 2-dimensional soil-water coupled elasto-plastic deformation analysis is reported.
- 2002-02-01
著者
-
橋本 聖
独立行政法人 土木研究所 技術推進本部
-
後藤 勝志
国土交通省関東地方整備局 川崎国道工事事務所 川崎国道出張所
-
野津 光夫
Djm工法研究会
-
大平 久和
独立行政法人 土木研究所 技術推進本部
関連論文
- 技術紹介 DJM工法--最近の技術開発と周辺水質調査結果 (特集 世界に誇る地盤改良技術)
- 深層混合処理工法による安定対策を施した軟弱地盤上の盛土の動態観測結果(側方変位・流動の予測と対策)
- 安定対策工を施工した軟弱地盤上盛土の動態観測について (土質及び基礎特集)