電話局のコスト計画における概算法の試み : その3・予測コストの補正
スポンサーリンク
概要
- 論文の詳細を見る
Roughly speaking, the factors for revision of cost estimation in each design stage are difference of year, district and increase of floor space in the process switching over design stages. A building cost (substituted labour and material cost by the local standard subdivided cost)/the cost (by the Tokyo standard) is closely aligned in each district in spite of its kind of construction. Perhaps, it is due to the Principle wherein peaks cancel each other working among subdivided costs through the whole cost of each construction. Increase of the floor space, which is ordered during the early stage, caused up to the schematic design stage from the early stage, is unpredictable quantitatively, but any increase in the process to detail design stage from the schematic design stage is small and predictable.
- 社団法人日本建築学会の論文
- 1973-06-30
著者
関連論文
- 施設局舎部位別所要断熱性能値のグレーディングについて : 外壁 : 環境工学
- ビルディングエレメントの構法選択の手順と手段 : 建築計画
- 性能による構法選択のための基礎的研究 (その 3) : 性能の重みづけ
- コスト計画における概算法の試み : その2・電話局のコスト要因分析 : 建築経済・住宅問題
- 電話局のコスト計画における概算法の試み : その 4 体系化のために
- 電話局のコスト計画における概算法の試み : その3・予測コストの補正
- 電話局のコスト計画における概算法の試み : その 2 重回帰分析による
- 電話局のコスト計画における概算法の試み : 部位別コスト分析による
- コスト計画における概算方の試み : 建築経済・住宅問題