三井B&W大型2サイクル過給機関の運航実績について
スポンサーリンク
概要
- 論文の詳細を見る
In january 1960,79 turbo-charged two stroke engines, totaling 520,000 BHP had been in service for up to years. The service reports from numerous of these engines and our own investigations give a good basis of judging upon the functioning of the engines and directions for better maintenances.The following items are mentioned particularly based on the service results.(1) Control of turbo-charging system (2) Problems for heavy oil burning affecting on cylinder performance (3) Welded construction, etc.
- 社団法人日本船舶海洋工学会の論文