船体の縦移動工法について
スポンサーリンク
概要
- 論文の詳細を見る
In view of increasing production by minimizing the construction period on berth, and also, to keep the constant working hours of berth, the most important and necessary for the shipyard is the efficient utilization of the existing berth, and to commence outfitting in the engine room at an early stage of construction is also effective for minimizing the period on berth. From this view-point, we have adopted tandem-construction method. While ship is constructed on the aft portion of berth by the method, aft body blocks of next ship, including engine room, is pre-erected on the fore-portion of the same berth. After launching of the former, the latter is removed to a proper position of the aft-portion of the berth. We had already adopted this method several times intermittently. But, as recently it became necessary for us to adopt this method continuously. We started with this planning from 1971, and completed the first travelling successfully on 12 th Oct., 1972. This method is characteristized by safety control and minimum operators with full auto matization of travelling equipments. In this report, the planning and first travellng result are described.
- 社団法人日本船舶海洋工学会の論文
- 1973-03-30
著者
-
岡本 治郎
Mitsubishi Heavy Industries Ltd. Kobe Shipyard
-
宮田 貞一
三菱重工業株式会社 横浜造船所 造船工作部
-
宮田 貞一
三菱重工業(株)神戸造船所
-
岡本 治郎
三菱重工業株式会社神戸造船所
-
友貞 三郎
三菱重工業株式会社神戸造船所
-
松浦 利昌
三菱重工業株式会社神戸造船所
-
浦 久康
三菱重工業株式会社神戸造船所
-
下河 章啓
三菱重工業株式会社神戸造船所
関連論文
- (2)縮尺現図におけるカッティングプランとスクラップ率の低減について(工作法シンポジウム案内)
- 既設船台における超大型船建造
- Construction of New Diesel Driven Container Ship Utilizing Structurally Renovated Midbody
- 船体建造における立体ブロック方式について
- 升目水平すみ肉溶接ロボットの開発
- 小型船建造合理化の考え方とその実際
- 船殼工事における品質管理
- スチールハッチカバーとハッチコーミングのユニット工事について
- 広幅15万トンタンカーの進水について
- 船体の縦移動工法について
- 新造コンテナ船建造について : 船殼建造
- 浮力損失法による進水方式