単船台建造におけるプリエレクションステージについて
スポンサーリンク
概要
- 論文の詳細を見る
The following points are emphasized in this paper. (1) A new control system developed by the author is adopted at the pre-erection-stage. (2) The stage-area is developed into two functional parts, a group of working areas and a stock area, to the best advantage. (3) Many kinds of jobs are organized to the standard working process. (4) Every working process in the pre-erection-stage is made clear and the working-schedule is made easily by the above mentoned standard process. (5) The process-control-staff is able to get requisite information from every stage of working processes, and concequently able to remove trouble properly at the pre-erection-stage.
- 社団法人日本船舶海洋工学会の論文
- 1970-09-30