造船の大日程計画と経済計算 : とくに艤装工程を中心として
スポンサーリンク
概要
- 論文の詳細を見る
The Method of Project & Man-hours Control for ship-building is quite different from that of the mass-production control, due to each different tendency of individuality, stability etc. Now, all makers have been forced to cost down their products for price-race, today, ship-builders are also the same, so that the above mentioned control has come up one of the most important problems with those related to large-sized ship structures and automation in operation of ships. The author presents a view on the method of the control by scientific programming to save cost, here.
- 社団法人日本船舶海洋工学会の論文
- 1965-03-30