造船CIMSのための工程管理システムの構築
スポンサーリンク
概要
- 論文の詳細を見る
The Ship and Ocean Foundation has been conducting the feasibility study on CIM for shipbuilding and establishing a conceptual framework for the CIM for shipbuilding. Now the committee has finihshed the conceptual design of the pilot model of CIM for shipbuilding and has been prototyping it. The pilot model has the function of designing and production management, and the latter is realized by the following systems ; process planning, scheduling, and production control. The function of the production control system is to dispatch operations to workers and facilities for daily schedules, to monitor the status of operations in progress, and to troubleshoot in case of any troubles. In this paper dispatching and troubleshooting of the production control system and how the system should co-operate with the scheduling system are mainly discussed, and the concept of operation lot and production resources, which is found necessary on process of constructing the information model, and the method of dispatching which meets the functional requirement of the production control are proposed.
- 社団法人日本船舶海洋工学会の論文
著者
-
堀内 一敏
(財)シップ・アンド・オーシャン財団造船cimsパイロットモデルの開発研究委員会推進部会専任チーム:(株)三菱総合研究所
-
峯村 隆久
(財)シップ・アンド・オーシャン財団造船CIMSパイロットモデルの開発研究委員会推進部会専任チーム
-
雨宮 俊幸
(財)シップ・アンド・オーシャン財団造船CIMSパイロットモデルの開発研究委員会推進部会専任チーム
-
峯村 隆久
(財)シップ・アンド・オーシャン財団造船業cim開発研究委員会専任チーム:三菱重工業(株)
-
雨宮 俊幸
(財 )シップ・アンド・オーシャン 財団造船業 Cim フレームモデルの開発委員会:住友重機械工業(株)
関連論文
- 造船CIMSのための工程管理システムの構築
- 造船業CIMのための日程計画情報の表現に関する研究
- (2) 造船CIMSの概要 : (2-4)生産管理(造船CIMS)
- (2) 造船CIMSの概要 : (2-3)生産計画(造船CIMS)
- 造船CIMSのための工程設計システムの構築 : 第2報:近代化工場への適用
- 造船CIMSのための工程設計システムの構築