The status of the ITER Project is presented. The objective of ITER is to demonstrate the scientific and technical feasibility of fusion energy for peaceful purposes. The design of the new ITER has been progressed. Its concept development, plasma performance, engineering feasibility, construction schedule and experimental plan are summarized in this report. Technology R&D has validated and qualified the design, and full size or scalable models of key components have been successfully manufactured and tested. The phase of the Engineering Design Activities (EDA) will be finalized by July 2001. ITER construction site offer(s) with governmental endorsement and negotiations are expected to start by the end of the EDA. Assuming the commencement of the ITER Construction, Operation, Exploration and Decommissioning Activities in early 2003, a controlled fusion power of 500 MW will be demonstrated around the year 2015.
- 社団法人プラズマ・核融合学会の論文
- 2000-09-25
著者
関連論文
- II ITERの概要 7. 結論
- II ITERの概要 6. コスト評価
- II ITERの概要 5. 建設および運転スケジュール
- II ITERの概要 4. ITER建設サイト条件
- II ITERの概要 3. ITER装置の特徴
- II ITERの概要 2. ITERの主要パラメータ
- II. ITERの概要 1. 序論
- 核融合実験炉ITERの建設に向けて
- ITERの工学設計とR&D(シンポジウムVII : ITER設計の現状 : 物理と工学R&Dの進展を中心として)
- 新しいITER
- I ITER計画 2. 工学設計活動(EDA : Engineering Design Activities)の概要
- I ITER計画 1. ITER計画の背景
- I ITER計画
- はじめに
- 中性粒子入射加熱装置の開発の現状(資料)