トンネル覆工の漏排水対策
スポンサーリンク
概要
- 論文の詳細を見る
On the excavation of such a under ground condition as encountering sand quick phenomenon, well-point method to lower the water-table or deep-well method to reduce the water pressure at heading is ordinally adapted. When the water-table revive after lining, sometimes leakage and piping of water cause a serious problem. This paper reports the piping phenomenon of Obara tunnel in Tokaido-Shinkansen and the counerplans for leakage and drainage of Higuchiyama tunnel in Sanyo-Shinkansen.
- 一般社団法人日本応用地質学会の論文
- 1975-06-30